SemiAccurate have leaked a tentative line-up for NVIDIA's 28nm mobile GPUs. The first 28nm mobile GPUs are set to be sampled in Early October, with mass production commencing in End December if everything goes to plan. Availability is scheduled for Q1 2012. Crucially, these 28nm parts are not based on the next-gen Kepler architecture, but are die shrinks of the current Fermi architecture powering GeForce 400/500 series.

Read More:
NVIDIA's 28nm mobile line-up revealed